When the results are collected carefully formulas can be applied to figure the varying pressure that will be available when different amounts of w.
Water flow test report.
Click here for a sample fire hydrant flow test report.
The report will be emailed or faxed to the attention of the person on the request letter.
The shutoff head is equal to the static pressure head at hydrant 1.
The most common test involves measuring the flow of water flowing out of a municipal fire hydrant while recording how much the water pressure has dropped.
The shutoff flow will always be 0 gpm.
You will receive a report that includes the static and residual pressure of the main and the flow rate at each hydrant.
In order to use the flow test results in a water model you must create a 3 point pump curve.
A water flow test also known as a hydrant flow test is a way to measure the water supply available at a building site usually for the purposes of installing a water based fire protection system.
During the course of the test the water flow should be monitored and re measured every 15 minutes to make sure that a constant flow rate is maintained.
Interpret your water test results many well owners need help understanding water test results.
A home inspector will sometimes run the water flow test while performing the home inspection.
4 1 the flow test procedure is carried out by measuring the flow of water available from the distribution system at the rating pressure.
4 3 larger mains of higher capacity will require the simultaneous testing of several hydrants.
One way to understand your results is to ask the lab that did the testing.